Process Plant Shutdown and Critical Activities: Isolation, Start-Up & Commissioning

Featured 2 Schedules Available

Understand where shutdowns sit in the life cycle of a process plant, and how planned, emergency and corrective shutdowns differ. Participants work through shutdown planning and preparation, and the critical isolation procedures that keep the event safe from first valve to restart.

Process Plant Shutdown and Critical Activities: Isolation, Start-Up & Commissioning

This subject may be offered at different levels; scope, depth and prerequisites are confirmed for the selected programme.

Objectives:

  • Understand the importance of plant shutdowns in the life cycle of process plants.
  • Identify the various types of shutdowns: planned, emergency, and corrective.
  • Overview of shutdown planning and preparation processes.
  • Learn the critical isolation procedures for safely shutting down process units.
  • Understand the safety requirements and regulatory compliance during isolation.
  • Gain knowledge of startup activities post-shutdown.
  • Understand how to safely transition from shutdown to normal operation.
  • Understand the commissioning process for new or modified equipment and systems.
  • Learn about commissioning checks and verification activities - Review the post
  • shutdown performance of the plant and identify any issues.
  • Understand how to improve future shutdown and startup processes.

 

Day 1: Introduction to Process Plant Shutdown:

  • Shutdown planning: objectives and strategies.
  • Pre-shutdown activities: inspection, resource allocation, and preparation.
  • Roles and responsibilities during a shutdown.
  • Identifying potential challenges during plant shutdown.

 

Day 2: Isolation Procedures and Safety Measures:

  • Types of isolations: mechanical, electrical, and instrumentation isolations.
  • Lockout and tag-out (LOTO) procedures.
  • Hazard identification and risk assessments (HIRA).
  • Safety standards and compliance during shutdown activities.
  • Case study: Best practices in isolation.
  •  

Day 3: Startup Procedures & Activities:

  • Start-up checklist and sequence of operations.
  • Safety precautions during the startup phase.
  • Start-up testing and performance checks.
  • Startup troubleshooting: identifying and solving common issues.
  • Coordination between operators, engineers, and other stakeholders during startup.

 

Day 4: Commissioning of Process Units:

  • Commissioning phases: pre-commissioning, mechanical completion, and commissioning.
  • Role of commissioning in plant optimization and performance validation.
  • Common commissioning challenges and how to address them.
  • Equipment testing, system verification, and start-up approval processes
  • Coordination with design and operational teams during commissioning.

 

Day 5: Post-Shutdown Evaluation and Performance Monitoring:

  • Post-shutdown review and troubleshooting: identifying areas of improvement.
  • Monitoring plant performance during the initial startup phase.
  • Continuous improvement: lessons learned and feedback loops.
  • Documenting the shutdown and startup process for future reference.

Related Courses

WhatsApp Call us Email